Skip to Main Content

Serious incident to the Airbus AS350 registered F-GGAO on 02/10/2026 at La Pacaudière

Secondary power line strike at landing in a surveillance flight

Responsible entity

France - BEA

Investigation progression In progress
Progress: 50%

The translation below is for information only:

After approximately 35 minutes of flight time, the navigator and observer requested the pilot in command (PIC) to abort the line inspection for data cross-checking.

The PIC elected to land in the immediate vicinity. On final approach, the helicopter was aligned with the power line, then performed a 180-degree turn to land. The tail rotor assembly struck an unnoticed secondary power line, running perpendicular to the primary line. The PIC continued with the landing.